The project entailed the stabilization of approximately 500 linear feet of eroding bank on the Crow River in St. Michael, MN. Included in the stabilization was a number of bio-engineering practices including site grading, toe wood installation, woven erosion blankets along with native seeding and live staking.
Project Partners: